Inconel machining services: what to send, what you get back and when

November 28, 2026

An order for Inconel machining services runs in seven stages, and most of the risk sits in three of them: the drawing review, the material and the heat treatment. Get those right and machining and inspection usually follow the plan. This guide walks through each stage in order, with what you send, what you should get back and the typical time, so you can plan an order or check a supplier’s dates.

Times are typical for machined parts in 718, 625, C-276 and 400 with material from stock. Mill orders, accredited special processes and large inspection plans sit at the long end or beyond.

Stage 1: the RFQ (day 0)

The quote can only be as good as the RFQ. For a nickel alloy part, send:

  • A STEP model and a PDF drawing with tolerances, thread callouts and surface finish notes. The PDF governs when the two disagree.
  • The alloy with its specification and condition, for example alloy 718 to AMS 5663, alloy 625 to ASTM B446 Grade 1 or alloy C-276 to ASTM B574.
  • The hardness or strength requirement, the scale and where on the part it is measured.
  • Batch quantity and annual volume. A price for 20 pieces once is not the price for 20 pieces every quarter.
  • The documents and tests you need: mill certificate type, hardness report, first article report, penetrant test, NACE MR0175 / ISO 15156 limits.

If the alloy is not fixed yet, give the service temperature and environment instead. The alloy guide by service condition shows how those point to an alloy.

Stage 2: alloy and drawing review (within 24 business hours)

The review catches the gaps that cause trouble later. In nickel alloys the usual ones are:

  • A specification without an edition, or a condition that does not match the hardness asked for.
  • No statement on whether heat treatment may follow rough machining.
  • Small threads in aged material where a larger size or thread milling would save time and risk.
  • Tight tolerances on non-functional features.

You get questions or a feasibility note. Partner shops asked to price the part receive the drawing and the requirements, never your name or company.

Stage 3: the itemised quote (2 to 5 business days)

One quote, every cost on its own line. For nickel alloys that matters, because material and heat treatment can be as large as the machining:

Line Unit What it covers
Part price per quantity break per part Machining and standard deburr
Material to specification per lot Bar, plate or forging with mill certificate, any stockist minimum
Programming and fixtures one-off Paid once, kept for repeat orders
Heat treatment per lot Cycle to your spec, certificate and hardness results
Special processes per lot Penetrant test, cleaning, marking
Inspection and report per lot First article for new parts, then a sampling plan
Packing and delivery per shipment Per the delivery terms on the quote

The quote also states the route: whether the part is cut from aged stock or roughed, aged and finished. That route explains most of the price difference between two quotes for the same drawing.

Stage 4: PO and material (1 to 3 weeks from stock)

You send one PO. Material is bought to the specification on your drawing. Before cutting, the mill certificate is checked against it: grade, condition, chemistry and mechanical results. The heat number is recorded so it follows the material to the finished part.

This is where nickel alloy lead times swing most. Common bar sizes in 718 and 625 are usually in stock with a certificate. Unusual sizes, plate thicknesses, forgings or tight specifications may need a mill run, which can add 8 to 20 weeks. If the date matters, ask on the RFQ which stock sizes are available and whether a larger standard bar would do.

Stage 5: machining and heat treatment (2 to 6 weeks)

The partner shop chosen for the alloy and the part runs it. For a new part, the first piece is measured on every dimension and the first article report comes to you for approval before the batch runs.

For age-hardened alloys, heat treatment sits inside this stage. On the common rough, age and finish route, the parts leave the machine after roughing, go through the aging cycle with a hardness check and return for finishing. That adds 1 to 2 weeks, typical, and it is why aged parts take longer than annealed 625 parts of the same size. The heat treatment page explains the routes and the typical cycles.

Every week you get an update: status against plan, photos from the run, hardness results as they come in and any question on the drawing.

Stage 6: inspection before packing (2 to 4 days)

The parts are inspected against your drawing before packing. The report lists:

  • Measured values for each dimension, or for the critical ones on a sampling plan, against their tolerances.
  • The instruments used and the sample size.
  • Hardness results after heat treatment, with the test location.
  • Visual and surface finish checks.
  • Photos of parts, labels and packing.

If a feature is out of tolerance you hear about it here, with the measured value and a proposed action. Nothing out of tolerance ships without your written approval.

Stage 7: delivery and the document pack

The parts ship with the document pack. For most nickel alloy orders that is:

  1. The mill certificate, EN 10204 3.1 when asked for.
  2. The heat treatment certificate with the cycle and hardness results.
  3. The inspection report.
  4. Any process certificates the drawing called for, such as penetrant testing.
  5. A certificate of conformance against the drawing revision and the PO.

The files arrive before the parts, so your receiving inspection can plan.

Planning tips for repeat orders

  • Buy material for the year. A blanket PO with scheduled releases lets the material be bought once, with one certificate, at a better price.
  • Keep the route fixed. Once a part runs well on one heat treatment route, keep it. Changing the route changes how the part moves.
  • Freeze the revision. Drawing changes in nickel alloys are costly because programs, fixtures and the first article all change.

For alloys above the 718 temperature range, machining Waspaloy and X-750 covers the extra steps.

To start, send the drawing for a quote. We reply within 24 business hours with questions or a feasibility note, then send one itemised quote.

Frequently asked questions

What should an RFQ for Inconel parts include?

A STEP model and a PDF drawing, the alloy with its specification and condition, the hardness requirement and where it is measured, the batch size and annual volume plus the documents and tests you need. If the alloy is still open, add the service temperature and environment.

How long does an order for Inconel parts take?

With material in stock, 4 to 8 weeks from PO to shipment is a typical range for a machined part with heat treatment and standard inspection. Material from a mill run can add 8 to 20 weeks. The quote gives dates for your part.

Which documents come with nickel alloy parts?

Usually the mill certificate for the material, the heat treatment certificate with hardness results, the inspection report and a certificate of conformance. A first article report, positive material identification or a penetrant test certificate are added when the drawing or PO asks for them.

Price your nickel alloy part

Send the drawing with the alloy, specification and quantity. You get one itemised quote for the finished parts, and we reply within 24 business hours.

Send drawing for a quote