Quality checks and the document pack for nickel alloy parts
With nickel alloys, the paper matters as much as the part. A part made from the wrong heat or aged to the wrong cycle can look perfect. This page lists what is checked, when, and what you receive with the parts.
What is checked, in order
The same sequence on every order. An engineer follows each order and owns these checks with the partner shop that makes the parts.
Drawing review
Alloy, specification, condition, hardness, tolerances, threads, surface finish and the documents asked for. Open points are raised before pricing.
Material check
The mill certificate is compared with the specification on your drawing before cutting: grade, condition, chemistry and mechanical results.
Heat number traceability
The heat number follows the material through cutting, heat treatment and inspection, and appears on the inspection report.
First article
For a new part, the first piece is measured on every dimension and the report is sent for your approval before the batch runs.
In-process checks
Critical features are measured during the run, so a worn tool or a moving part is caught before it becomes a batch problem.
Final inspection before packing
Measured values against your tolerances, hardness after heat treatment, visual checks and photos. Sent before the cartons close.
Documents you receive
Sent with the parts, and as files before they arrive so your receiving inspection can plan. The list for your part is written on the quote.
- Mill certificateFrom the mill or the stockist, to the specification on your drawing. EN 10204 3.1 when asked for.
- Heat treatment certificateCycle, furnace load and hardness results for age-hardened or stress-relieved parts.
- Inspection reportMeasured values, instruments, sample size and photos of parts and packing.
- First article reportEvery dimension of the first piece. In AS9102 format when your drawing or PO asks for it.
- Material identificationPositive material identification results when the PO calls for it.
- Process certificatesPenetrant test, passivation or cleaning certificates when the drawing calls for those processes.
- Certificate of conformanceStating that the parts meet the drawing, revision and PO.
Standards and certificates
Nickel alloy drawings often carry requirements beyond the dimensions: NACE MR0175 / ISO 15156 hardness limits, AMS or ASTM material specifications, heat treatment and pyrometry standards, penetrant testing or an accredited special process. Put them on the drawing or the RFQ.
Any certificate or accreditation the part needs is stated on the quote, with how it will be met, before you place the PO. If a requirement cannot be met for your part, the quote says so.
If your drawing is export controlled, tell us before you send it so it is handled correctly from the first email.
When a feature is out of tolerance
You hear about it before packing, with the measured value, the feature and a proposed action: rework, remake or a deviation request for your engineering team. Nothing out of tolerance ships without your written approval.
Who pays for rework or a remake, and how fast it runs, is written on your quote.